Source

Guidance document Time limits for authorization applications

6.1 New layout, no content adjustments to the previous version. tsj

6.0 Due to expansion of scope of temporary authorisations: New inclusion of time stb

limits for temporary additional indications in Annex 1

5.0 Correction in Annex 1: Deletion of application type conversion of temporary to stb/lm

regular authorisation

4.0 Adaptation of guidance document due to new structure for VMP variations (early fg/ps

revision of VMP regulations) Details of FTP application procedure / temporary authorisation deadlines

3.2 Correction of the footnote in annex 1 stb

3.1 Formal adjustments to the header and footer dei

No content adjustments to the previous version.

3.0 Annex 1 – Overview of time limits: Explanation that companies have 30 calendar stb

days to respond if the PD is a rejection.

2.1 Annex 1 – Overview of time limits: Explanation regarding the six-day submission dts

window for responses to the LoQ in fast-track and temporary authorisation procedures.

2.0 Correction of Time limit categories / Application types, Variation Type IB, stb

Correction of documents subject to formal objection: 30 CD. Correction of the footnote 3 on page 11.

1.0 Implementation of TPO4 dts